MILESTONES

Project Duration: 07/2016 - 08/2020

Jul 04, 2016

Project Kick off

The project Kick Off was held in ADS facilities near Madrid Spain. The partners and the project leaders reviewed the project objectives and its plans. The partners  also discussed the work methodology and the coordination activities.

Jan 25, 2017

Feasibility Design Review

The project Feasibility Design Review showed that the project objectives are very challenging however Feasible. 

Jul 26, 2017

Preliminary Design Review

The Preliminary Design Review took place at RaySat facilities in Sofia Bulgaria. The PDR included a review of the system architecture and the specification of the different LRUs and the interconnect between them.

Mar 08, 2018

Critical Design Review

The CDR included freezing of the interconnection to the A/C. It also included calculations of the structure strength and formation in the defined aerodynamic and flight envelop conditions. detailed design was presented. 

flag-green-icon.png
Mar 27-28, 2019

Test Readines Review

In this milestone test readiness was reviewed.

Aug 01, 2020

Flight Test Readines

Flight testing readiness will be reviewed

Sep 01, 2020

PCM

The project conclusion meeting will include presentation and discussion of the project results. 

Jan 01, 2019

Equipment Delivery

The equipment will be delivered to the topic leader for installation within the A/C.  