MILESTONES
Project Duration: 07/2016 - 08/2020
Jul 04, 2016
Project Kick off
The project Kick Off was held in ADS facilities near Madrid Spain. The partners and the project leaders reviewed the project objectives and its plans. The partners also discussed the work methodology and the coordination activities.
Jan 25, 2017
Feasibility Design Review
The project Feasibility Design Review showed that the project objectives are very challenging however Feasible.
Jul 26, 2017
Preliminary Design Review
The Preliminary Design Review took place at RaySat facilities in Sofia Bulgaria. The PDR included a review of the system architecture and the specification of the different LRUs and the interconnect between them.
Mar 08, 2018
Critical Design Review
The CDR included freezing of the interconnection to the A/C. It also included calculations of the structure strength and formation in the defined aerodynamic and flight envelop conditions. detailed design was presented.
Mar 27-28, 2019
Test Readines Review
In this milestone test readiness was reviewed.
Aug 01, 2020
Flight Test Readines
Flight testing readiness will be reviewed
Sep 01, 2020
PCM
The project conclusion meeting will include presentation and discussion of the project results.
Jan 01, 2019
Equipment Delivery
The equipment will be delivered to the topic leader for installation within the A/C.